| 1988 |
Company establishment |
| Started construction of 1st Factory and Head Office |
| 1989 |
Started production of Ceramic Filter (Temporary Factory) |
| Started production of Posistor and Buzzer |
| Started production of Focus Adjusting Resister |
| 1991 |
Started production of Flyback Transformer |
| 1992 |
Started production of Electronic Tuner and VIF-UNIT |
| 1993 |
Started production of AC Line Filter |
| 1994 |
Started production of High Voltage Transformer |
| 1998 |
Started production of High Voltage Power Supply |
| Started production of Piezoelectric Vibrating Gyroscope |
| 1999 |
Started production of Switching Power Supply |
| Started production of Ultrasonic Sensor |
| 2000 |
Started production of High Voltage Ceramic Capacitor |
| 2001 |
Started production of Digital CATV Tuner |
| 2003 |
Started production of Coils Antenna |
| 2007 |
Invested in land and property at the 3rd zone area |
| 2008 |
Started production of Metal Plate for Buzzer (Fac.9) |
| 2010 |
Opened Factory 12 |
| 2011 |
Opened Factory 14 |
| Started construction of Microblower |
| Started production of EMI Suppression Filter (Chip) (Fac.14) |
| 2012 |
Started production of Polymer Aluminum Electrolytic Capacitors (Fac.12) |
| Started production of Magnetic Sensor (Fac.5) |
| Opened Sub-Station 1 |
| 2013 |
Opened Factory 15 |
| Started production of Red Sensor |
| Started production of Shock Sensor |
| Started production of High Voltage Ceramic Capacitor (Element) |
| 2016 |
Started production of High Voltage Ceramic Capacitor (SMD) |
| 2018 |
Opened Parking building |
| Opened Complex building |
| Opened Sub-Station 2 |
| Started production of TKANTB |
| Started production of TKANTC |
| Launched Solar Rooftop installation |
| 2019 |
Opened Factory 16 |
| Opened Factory 17 |
| Started production of Cutting Blade |
| Started production of Rotor |
| Started production of High Voltage Ceramic Capacitor (Axial) |
| 2020 |
Started production of PSIP |
| Started production of MonoBK |
| 2023 |
Invested in land and property at the World Industrial Estate (West-Site) |
| Started production of Multilayer Ceramic Capacitors |
| 2024 |
Invested in land and property at the 4th zone area |
| 2025 |
Invested in land and property at the 5th zone area for Solar-Farm |
| Opened Co-Murata (MTL Co-Working space with Chiang Mai University) |
| 2026 |
Started production of DC-MOD(A) |